PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Staggered wire Mesh at the 3rd Floor. (6) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (7) (800x600).jpg Staggered wire Mesh at the 3rd Floor. (8) (800x600).jpg Welded Skylight steel beam Facing East (800x600).jpg Welding the Skylight beams Facing East (800x600).jpg Installed Duct work hangers throughout the 1st floor Facing North (800x600).jpg Installed electrical conduit at Stair -4 (4th Floor) Facing East (600x800).jpg Installed electrical conduit at the steel column Facing West (800x600).jpg Installed shear studs at the lower roof Facing East (800x600).jpg
Previous pageNext page Welding the Skylight beams Facing East (800x600)
Welding the Skylight beams Facing East (800x600)